Case Study: Planetary Cabler

DPS Group were engaged to provide a turnkey solution to design, build and maintain a Planetary Cabler for Oceaneering.


This was part of a process to increase production capacity and diversify of the product range through its Rosyth manufacturing facility.

Improvements were also to be made to the machine safety system. 


Share: