Case Study: Shetland Gas Plant

DPS Group worked with Shetland Gas Plant to undertake 75,000 pre-commissioning & ATEX inspections on site wide electrical, instrumentation & telecom packages.


As the largest construction project in the UK at the time of completion, the Shetland Gas Plant processes gas from the Laggan and Tormore fields located 125km North West of the Shetland Islands and export it via 30” pipeline to the St Fergus gas terminal near Peterhead in Aberdeenshire. It will provide 8% of the UK’s Gas for the next 30 years.

DPS Group was required to undertake 75,000 Pre-commissioning and ATEX Inspections on site wide electrical, instrumentation and telecom packages.